Energy hub for your business park

Shared capacity.Unlimited growth.

Connect multiple sites—business parks, residential districts, and e-mobility hubs—and orchestrate their energy as a single, powerful collective. Bypass regional grid congestion, unlock stranded capacity, and resume your growth trajectory without waiting for physical grid expansions.

1 collective

Multiple sites orchestrated as a single smart grid.

0 grid upgrades

Keep growing without a heavier grid connection.

100% automated

Flawless financial settlement between all participants.

The challenge

Your grid connection is maxed out. So is your neighbor's.

Entire business parks and development zones are grinding to a halt because the local utility substation cannot handle peak demand. Operating in isolated silos, every individual building runs right up against its own capacity ceiling—with every kW already spoken for, there's simply no room left to electrify, expand or add new load.

The painful irony? While one facility is maxing out its connection, the company next door likely has unused capacity at that exact same moment. The capacity you lack individually can be unlocked collectively.

The solution · Energy Hub

Together, peak loads cancel each other out.

Evogrid connects independent companies into a virtual energy collective. By orchestrating your assets behind a single, shared grid limit, individual peak loads naturally balance each other out. One participant's energy surplus instantly covers another's shortfall, unlocking immense capacity you could never access alone.

Three companies · 400 kW each contracted

individual

per companycontract limit
contract limit · 400 kWCompany ACompany BCompany C00:0012:0024:00

peaks

3 moments

each at its ceiling

400 kW

room to grow

0

Three companies, each peaking right up against its own 400 kW ceiling — no headroom left on top.

Each company runs its own connection and peaks at its own moment—Company A in the morning, Company B around midday, Company C in the evening. At its peak, every one of them runs right up against its 400 kW ceiling. It stays within contract, but there's no headroom left: no room to add an EV charger, a heat pump or a new production line.

Collective · grid limit 1,200 kW

collective

individual profilesstacked togethergrid limit
grid limit · 1,200 kWCompany ACompany BCompany Croom to grow · +300 kW+ EV charger, heat pump…00:0012:0024:00

collective peak

≈ 900 kW

free headroom

300 kW

room to grow

yes

Stacked together, the combined load stays well under the shared 1,200 kW limit — that gap is room to grow.

Together it's a different story. Because the three peaks fall at different moments, the combined load settles at about 900 kW—well under the shared 1,200 kW limit. That frees up 300 kW of headroom: real room for the participants to add EV chargers, heat pumps and new capacity, without a single grid upgrade.

Who it's for

Business parks & commercial clusters

Consortiums of companies that urgently need to expand production lines, electrify vehicle fleets, or install large-scale solar, but are paralyzed by regional grid congestion.

Area developers & e-mobility hubs

Project developers aiming to power entire new-build residential districts, massive fast-charging plazas, or mixed-use real estate as a single, self-balancing energy ecosystem.

How it works

The intelligence driving the Energy Hub.

  1. 01

    Data integration

    We securely aggregate consumption, generation, and storage data from every participant, enriching the model with weather forecasts and live EPEX day-ahead and imbalance market pricing.

  2. 02

    Anticipation

    The platform utilizes AI to forecast energy supply and demand for both the individual participants and the collective as a whole, projecting hours and days in advance.

  3. 03

    Strategic trade-offs

    One participant's surplus automatically and seamlessly covers another's demand. Any remaining collective power is strategically stored in a neighborhood battery or traded for maximum profit on the open energy markets.

  4. 04

    Continuous execution & settlement

    The system dynamically routes power across the hub in real time, ensuring the collective always operates safely within the shared grid limit. Financial settlement between all parties is handled flawlessly and automatically.

What it delivers

The concrete impact of an Evogrid Energy Hub.

01

Immediate room to grow

Resume business expansion, e-mobility rollouts, and facility electrification instantly—without waiting years for utility grid upgrades.

Frequently asked questions

The tough questions first, then the signature.

Sharing critical energy capacity rightly raises questions about fairness, legal frameworks, and grid operator involvement. Here are the answers to the questions we receive most often.

Get started

Curious about the exact results for your collective?

We model the solution using actual data from your business park or development site to show the precise capacity and financial returns upfront. The final decision is yours.

No strings attached · Modeled using your actual data · Results within one business day

Control your grid. Monetize your assets.